Factory made, site finished
TIME : 2016/2/27 17:42:45
Factory made, site finished
The Sunset Breezehouse normally arrives about
three months after the factory takes the order, with another
month for "button-up work" at the site. For display purposes
at Celebration Weekend, the process is condensed.
The two side modules and
Breezespace ceiling are constructed in a factory near
Vancouver, British Columbia.
A caravan of three long freight
trucks arrives at our headquarters from the factory. The
house is in six parts: two roof and two floor sections for
the Breezespace, and two long modules that include the
finished bedrooms, bathrooms, kitchen, and library/guest
room/office. The Sunset parking lot serves as temporary
building site.
In about five hours, the two
modules are lowered onto the foundation, and a
35-ton-capacity crane places each roof section to span the
facing walls. Over the next few days, the sections are bolted
together and some button-up work is completed.